Welcome to TEAM -
  Search


 
 
 
 
Date
Description
09.02.10
MARYLAND PORT ADMINISTRATION CONTRACTS TEAM TO DELIVER AN INNOVATIVE PASSENGER BOARDING BRIDGE
TEAM contracted to design, manufacture and deliver in early 2011 a safe, comfortable and innovative Passenger Boarding Bridge at the South Locust Point Cruise Terminal in Baltimore
08.04.10
TEAM TO DELIVER THIRD ‘’CREUERS BARCELONA’’ PASSENGER BOARDING BRIDGE
Creuers del Port de Barcelona S.A. contracts TEAM to deliver in early 2011 a third Passenger Boarding Bridge to serve the mega cruise ships of the future
07.07.10
NORWEGIAN EPIC ARRIVES IN THE PORT OF MIAMI AND TEAM PASSENGER BOARDING BRIDGES ARE INAUGURATED
TEAM successfully assisted the Port of Miami today with the first embarkation and disembarkation services to the Norwegian Epic with two specially designed Passenger Boarding Bridges.
03.01.10
TEAM DESIGNS FOR PORT OF KIEL AN INNOVATIVE PASSENGER BOARDING BRIDGE
TEAM challenged to deliver an innovatively designed Passenger Boarding Bridge capable of serving cruise ships and Stena Line’s ferry vessels at the new passenger terminal Sweden Quay in the Port of Kiel.
12.23.09
TEAM SELECTED FOR THE CRUISE CENTER II IN HAMBURG
The Fischereihafenent- wicklungsgesellschaft mbH & Co. KG awards TEAM a contract to design and manufacture a KRONUS Passenger Boarding Bridge for the new terminal building at Cruise Center II in Hamburg, Germany
11.23.09
TEAM’S FIRST ON MALLORCA
Ports de Balears awards TEAM a contract to design and manufacture two PEGASUS Passenger Boarding Bridges for the new Ferry Terminal in the port of Alcudia
11.11.09
ALABAMA CRUISE TERMINAL STARTS BOARDING A FANTASY
TEAM’s newest Passenger Boarding Bridge inaugurates the home porting of the Carnival Fantasy in Mobile, Alabama
09.30.09
TEAM’S NEW GENERATION PASSENGER BOARDING BRIDGE ‘’CREUERS BARCELONA’’ SUCCESSFULLY SERVICES CARNIVAL DREAM
TEAM completed in the Port of Barcelona the installation of the New Generation Passenger Boarding Bridge ‘’CREUERS BARCELONA’’, in-time to successfully service the Carnival Dream on its inaugural visit to the leading Mediterranean cruise port
08.21.09
TEAM TO DELIVER PASSENGER BOARDING BRIDGES AT NEW FERRY TERMINALS IN MEXICO AND MOROCCO
TEAM wins contracts for two Passenger Boarding Bridge installations at the new ferry terminal in the port of Cozumel, Mexico and four Passenger Boarding Bridge installations at the new ferry terminal in the port of Tangier Med, Morocco
07.24.09
TEAM WINS CONTRACT FOR THE PORT OF SAN DIEGO
TEAM contracted to deliver in the summer of 2010 one mobile Passenger Boarding Bridge of the SEDNA range for the new Broadway Pier Cruise Terminal in San Diego, USA
03.19.09
ALABAMA CRUISE TERMINAL TO BE UPGRADED WITH NEW PASSENGER BOARDING BRIDGE PROVIDED BY TEAM
The City of Mobile, Alabama (USA) contracts TEAM to design, build and install a Passenger Boarding Bridge of the HYDRA range for its Cruise Terminal, ready for operation in October 2009
03.06.09
TEAM’S FIRST IN FRANCE
Marseille Provence Cruise Terminal (MPCT) contracts TEAM to design, manufacture and install this year two Passenger Boarding Bridges of the HYDRA range for the Cruise Terminal on the Leon Gourret Pier in Marseille
02.05.09
AENA AWARDS A FIVE-YEAR CONTRACT TO TEAM FOR THE SUPPLY, MANAGEMENT AND MAINTENANCE OF LUGGAGE CARTS AT BARCELONA AIRPORT
12.16.08
TEAM WINS SEATRADE INSIDER CRUISE AWARD FOR SUPPLIER OF THE YEAR 2008
12.11.08
RENFE CONTRACTS TEAM TO PROVIDE PASSENGER INFORMATION SERVICES AT RAILWAY STATIONS IN BARCELONA
12.04.08
AENA CONTRACTS TEAM TO PROVIDE MAINTENANCE SERVICES AT TERMINAL 4 OF MADRID BARAJAS
12.04.08
MÁLAGA AMPLIFIES ITS CRUISE TERMINAL WITH TWO ADDITIONAL PASSENGER BOARDING BRIDGES
TEAM contracted to deliver in spring 2009 two passenger boarding bridges for the North berth of the ‘Estacion Maritima de Levante’
11.18.08
TEAM TO DELIVER NEW GENERATION ‘’CREUERS BARCELONA’’ PASSENGER BOARDING BRIDGES
Creuers del Port de Barcelona S.A. contracts TEAM to deliver in the Summer of 2009 two new generation Passenger Boarding Bridges to serve the mega cruise ships of the future
11.18.08
AENA CONTRACTS TEAM TO PROVIDE PBB DRIVING SERVICES IN THE NEW SOUTH TERMINAL AT BARCELONA AIRPORT
07.28.08
THREE PASSENGER BOARDING BRIDGES INAUGURATED IN ONLY FOUR WEEKS TIME
At the Ports of Barcelona and Malaga a total of three Cruise terminals received TEAM’s Boarding Bridges in time to provide optimal quality service to cruise lines and their guests this summer.
07.10.08
AENA CONTRACTS TEAM TO PROVIDE AIRCRAFT SUPPORT SERVICES AT MALAGA AIRPORT
06.19.08
AENA SELECTS TEAM TO PROVIDE BAGGAGE TRANSPORT AND MAINTENANCE OF BAGGAGE SYSTEMS SERVICES AT BARCELONA AIRPORT
06.04.08
TEAM TO DELIVER WORLD’S LARGEST PASSENGER BOARDING BRIDGE AT HARWICH CRUISE TERMINAL
TEAM challenged by Harwich International Port to design, manufacture and install by March 2009 the world’s largest Passenger Boarding Bridge for a Cruise Terminal
06.04.08
TEAM TO DELIVER A SECOND PASSENGER BOARDING BRIDGE FOR THE NEW ‘’CRUISE TERMINAL A’’ ON THE ADOSSAT QUAY IN BARCELONA
Creuers del Port de Barcelona S.A. contracts TEAM to deliver before the kick off of the 2009 cruise season a HYDRA passenger boarding bridge, identical but symmetrical to the unit recently installed at the new Cruise Terminal A in the Port of Barcelona, Spain
04.30.08
VENEZIA TERMINAL PASSEGGERI INAUGURATES PASSENGER BOARDING BRIDGE AND AWARDS TEAM A NEW CONTRACT
TEAM to design, manufacture and deliver another sophisticated HYDRA passenger boarding bridge for the new cruise terminal on the Isonzo quay in the Port of Venice, Italy
04.21.08
TEAM introduces a new range of Special Transport Trailers at SMOPYC 2008
• All vehicles are designed, manufactured and branded by TEAM


• TEAM launches the BSC TRAILER, a trailer with 3 axles, ready for the road

04.15.08
TEAM LAUNCHES INNOVATIVE GSE AT THE PASSENGER TERMINAL EXPO 2008 IN AMSTERDAM, THE NETHERLANDS
02.07.08
MALAGA’S NEW CRUISE TERMINAL GETS A TEAM PASSENGER BOARDING BRIDGE
This summer TEAM will deliver a modern passenger boarding bridge of the PEGASUS range for the recently inaugurated Cruise Terminal in Malaga
12.19.07
COSTA CRUISES SELECTS TEAM TO DELIVER A SECOND PASSENGER BOARDING BRIDGE FOR ITS CRUISE TERMINAL IN BARCELONA
TEAM will deliver before the kick off of the 2008 cruise season a HYDRA passenger boarding bridge, identical but symmetrical to the unit installed earlier this year at Palacruceros.
10.02.07
TEAM EFFORTS RECOGNIZED AT SEATRADE EUROPE 2007
TEAM selected as one of three finalists for the inaugural Seatrade Insider Cruise Awards 2007, in the category Supplier of the Year.
09.05.07
VENICE CRUISE TERMINAL TO BE UPGRADED WITH A MODERN PASSENGER BOARDING BRIDGE PROVIDED BY TEAM
TEAM will deliver a HYDRA passenger boarding bridge for the Banchina Tagliamento cruise terminals in the Port of Venice, ltaly before the start of the 2008 cruise season.
07.25.07
NEW CARIBBEAN CRUISE TERMINAL ‘SANS SOUCI’ CHOOSES TEAM
Sans Soucí Ports S.A. selects TEAM to deliver an innovative passenger boarding bridge for the new Sans Souci Cruise Terminal in the port of Santo Domingo, Dominican Republic.
06.21.07
TEAM PROVIDES GROUND SUPPORT EQUIPMENT TO INCHEON INTERNATIONAL AIRPORT
South-Korea’s leading international airport contracts TEAM to install 30 Potable Water Systems.
05.07.07
TEAM HIRES ENRIQUE FEDUCHY TO LEAD ITS PASSENGER TERMINAL SYSTEMS DIVISION
Barcelona, Spain, May 7, 2007 – TEAM, Tecnología Europea Aplicada al Movimiento S.L., a world leading provider of products and services to airport and seaport terminals, has strengthened its management team with the appointment of Enrique Feduchy as Managing Director of its new Airport Passenger Terminal Systems division.
04.23.07
NEW YORK CITY CONTRACTS TEAM FOR SERVICING ITS PASSENGER BOARDING BRIDGES AT THE BROOKLYN CRUISE TERMINAL
Barcelona / Coral Gables, 23 April 2007 - The New York City Economic Development Corporation (NYCEDC) and TEAM Port Services Inc. have signed a contract for the maintenance and operations of the two passenger boarding bridges installed at the Brooklyn Cruise Terminal in New York.
03.27.07
HARWICH INTERNATIONAL PORT SELECTS TEAM TO HELP MODERNIZE ITS PASSENGER BOARDING INSTALATIONS
Safety, modern design and passenger comfort were key elements for the selection of a TEAM passenger boarding bridge at the ferry terminal in Harwich.
03.12.07
BROOKLYN CRUISE TERMINAL RECEIVES VARIOUS AWARDS.
Successful first year in New York’s newest cruise facility, equipped with two TEAM passenger boarding bridges.
01.03.07
TEAM SELECTED BY THE PORT AUTHORITY OF MELILLA TO PROVIDE TWO PASSENGER BOARDING BRIDGES
Two passenger boarding bridges will facilitate ease of access for cruise and ferry passengers at Melilla’s new passenger terminal
11.20.06
TEAM EXPANDS ITS OPERATIONS INTO THE AMERICAS
New office opened in Coral Gables, Florida to provide first class service to fast growing Cruise and Ferry industries
04.11.06
TEAM SELLS AIRPORT PASSENGER BOARDING BRIDGES OPERATIONS TO THYSSENKRUPP
MARYLAND PORT ADMINISTRATION CONTRACTS TEAM TO DELIVER AN INNOVATIVE PASSENGER BOARDING BRIDGE
TEAM contracted to design, manufacture and deliver in early 2011 a safe, comfortable and innovative Passenger Boarding Bridge at the South Locust Point Cruise Terminal in Baltimore


Barcelona, 2nd September 2010 - TEAM, the world leading designer and manufacturer of sophisticated Passenger Boarding Bridges (PBBs) for cruise and ferry terminals, has recently been awarded a contract by Maryland Port Administration to design and manufacture a Passenger Boarding Bridge for the South Locust Point Cruise Terminal in the Port of Baltimore, Maryland, USA. TEAM was selected as the preferred provider of a safe, comfortable and innovative PBB system after Maryland Port Administration conducted a competitive RFP process. TEAM is to deliver the PBB in early 2011.

Baltimore is the sixth busiest cruise port in terms of passengers on the East Coast of the USA, behind four ports in Florida and one port in New York. This year the Port of Baltimore will have a record 91 homeport cruises onboard Carnival, Royal Caribbean and Celebrity and for 2011 the Port of Baltimore is scheduled to have 113 homeport cruises.

The state-of-the-art PBB currently in design will help improve safety and comfort for cruise operations in Baltimore. The PBB is innovative as the system will be the first of its kind. It consists of an enclosed air-conditioned mobile walkway structure with four fixed tunnel sections leading from quay level up to a height of 7 meters. At this highest point an integrated rotunda connects the walkway module with a 3-tunnel telescopic boarding bridge, defined as a KRONUS. The KRONUS is also air-conditioned and features next to an electro-mechanical driving system an electro-mechanical lifting system to reach the required highest and lowest elevations and match up with ship shell doors on various cruise ships.

Michael Bozman, P.E., Manager of Permits and Special Projects at Maryland Port Administration said: “We look forward to working with TEAM on a new Passenger Boarding Bridge for our cruise terminal. The Port of Baltimore’s cruise business has been a remarkable success story in the last few years, even in the face of a very difficult economy. Our cruise terminal’s easy access from major interstate highways, convenient onsite parking, and friendly port staff are all integral reasons for that success. With an air-conditioned and mobile Passenger Boarding Bridge, our customers will enjoy another comfortable amenity as they embark and debark from a memorable cruise vacation.”

TEAM’s Passenger Boarding Bridge is completely mobile, has the capability to drive along the whole quay and is able to connect with cruise ship entry doors at various levels. The whole steel structure consists of glass mounted tunnel sections and the cabin of the PBB is equipped with a uniquely integrated telescopic docking ramp that, when attached to the side of a cruise ship automatically follows the vessel’s movements and will safely undock in the event of an emergency. The clearance under the PBB allow for continuous truck, equipment and supplies traffic on the quay. The PBB is compliant with the Americans with Disabilities Act (ADA) and meets all other current laws, regulations, codes and standards and satisfies operating requirements.

When in 2011 this PBB is in operation in Baltimore, TEAM will have installed a total of 13 PBBs at cruise terminals in the USA including Miami, New York, Mobile, Norfolk, San Juan and San Diego.
 
TEAM S.L. | Copyright © 2009
Best Viewed using: Internet Explorer 7
Legal Note | Home